Commercial & HospitalityPhuket, ThailandProject summary supplied by OSMIVO
PROJECT CONTEXT
Client Background
A beachfront resort on an outlying island with 120 guest rooms, relying on a small aged SWRO system for daily water supply. Peak season water shortage had become a recurring complaint from guests.
PROJECT CONTEXT
Core Challenges
Island logistics caused long lead times and high freight costs for spare parts and replacement membranes.
The original equipment supplier provided no post-sales support, and component specifications were poorly documented.
The client needed a capacity upgrade but lacked technical reference for model selection and interface matching.
PROJECT CONTEXT
Our Sourcing Solution
Delivered a full SWRO system upgrade package, including high-pressure pumps, seawater RO membranes, control valves and pretreatment filters, all verified for interface compatibility.
Optimized shipping route via dual-port logistics (Beibu Gulf + Pearl River Delta) to cut transit time by 25% for island delivery.
Provided a complete spare parts starter kit and detailed operation manual, plus remote guidance for installation and commissioning.
REPORTED OUTCOMES
Project Results
System water production capacity increased by 30%, fully covering peak season guest water demand.
Fault response and spare part delivery time shortened by 70%.
The client later placed repeat orders for annual consumable replacement and system maintenance kits.
30%
higher water production capacity
25%
shorter transit time
70%
shorter response / spare-parts delivery time
PROJECT / ENGINEERING EVIDENCE
Project photographs & supporting materials
Select an image to inspect the supplied stock, BOM, equipment, engineering or delivery material at a larger size.
Treatment equipment supplied with the project materials Open image ↗Packing and dispatch photograph Open image ↗Project logistics routing illustration Open image ↗
Project descriptions and results are supplied by OSMIVO and relate to the individual installation. Routing and before/after graphics illustrate the case; outcome figures are not a guarantee for other systems.
REAL PROJECT CASES
From the requirement to the result.
Explore the purchasing context, coordinated solution and reported results in three project summaries supplied by OSMIVO.