General ManufacturingBinh Duong, VietnamProject summary supplied by OSMIVO
PROJECT CONTEXT
Client Background
A food processing factory with 3 steam boilers, facing scaling issues in boiler tubes due to substandard feed water quality. The problem had reduced boiler thermal efficiency and increased maintenance frequency.
PROJECT CONTEXT
Core Challenges
The original water softening system and precision filters were sourced from different vendors, with no unified technical matching.
The client planned to add an RO system but was unsure about model selection, pipeline connection and pressure matching.
Scattered spare parts inventory made emergency maintenance slow and costly.
PROJECT CONTEXT
Our Sourcing Solution
Provided a full BOM for boiler feed water treatment, including water softener systems, precision filter housings, RO membrane modules and chemical dosing units.
Cross-checked all operating pressure, flow rate and pipeline connection parameters to ensure seamless integration with existing boiler equipment.
Arranged phased delivery to align with the factory’s shutdown renovation schedule, minimizing production impact.
REPORTED OUTCOMES
Project Results
Boiler feed water hardness fully met the operating standard, and boiler cleaning cycle extended from 3 months to 12 months.
Boiler fuel consumption decreased by 8% due to reduced scaling.
All future replacement parts and consumables are centrally sourced through OSMIVO, with complete configuration records for fast reordering.
3 → 12 months
boiler cleaning interval
8%
lower fuel consumption
One BOM
recorded replacement parts
PROJECT / ENGINEERING EVIDENCE
Project photographs & supporting materials
Select an image to inspect the supplied stock, BOM, equipment, engineering or delivery material at a larger size.
Project descriptions and results are supplied by OSMIVO and relate to the individual installation. Routing and before/after graphics illustrate the case; outcome figures are not a guarantee for other systems.
REAL PROJECT CASES
From the requirement to the result.
Explore the purchasing context, coordinated solution and reported results in three project summaries supplied by OSMIVO.